狠狠色综合网站久久久久久久高清_欧美人伦禁忌dvd_日韩在观看线_99热这里只有精品地址_最近日本mv字幕免费高清在线_国产午夜精品一区二区三区欧美

Driven by Innovation, Smart for the Future.
Mineral Resources
Solution for dual drive drum belt conveyor in coal mines
Mineral Resources View volume: 24

1. Overview

The traditional solution of using a frequency inverter to drive an asynchronous motor in mining belt conveyors has several shortcomings, such as poor driving stability, low transmission efficiency, unbalanced power distribution between the master and slave units, and high energy consumption. With the rapid development of permanent magnet direct - drive technology and frequency conversion technology, the ore transportation solution now offers higher efficiency, lower power consumption, better reliability, longer transmission distance, and stronger multi - machine master - slave synchronization performance. This article introduces the application solution of the Yolico YDS8000 series frequency inverters for power balance in the permanent magnet direct - drive system of coal mine belt conveyor equipment.

2. Solution

The motor model is an external - rotor roller integrated permanent magnet synchronous motor (14.67hz/44rpm, 240A), and the frequency inverter model is YDS8160 T4N.

Introduction to the equipment process:
Figure 1: Schematic diagram of the belt conveyor

http://www.chengjinxi.cn/en/Data/upload/20250329/3f6b7e276fbe5c0fe54bd1ecedc27603.png

There are two frequency inverters, which control Motor 1 and Motor 2 respectively.
The control modes of the two motors are master speed control and slave torque control respectively. They are connected via analog signals.
The master motor sends two analog instruction, a speed instruction and a torque instruction to the slave station. To achieve synchronous performance, the speed variation rate is required within 5%.


http://www.chengjinxi.cn/en/Data/upload/20250329/d90e9f5ce5b0c9edcbfba5270730da25.png

On-site commissioning photos of the belt conveyor

http://www.chengjinxi.cn/en/Data/upload/20250329/3ca3b370140897baaf816fbbf7034018.png

The process of factory installation and commissioning

http://www.chengjinxi.cn/en/Data/upload/20250329/aa460f38929858f6768934f2b6f16d16.pnghttp://www.chengjinxi.cn/en/Data/upload/20250329/fd332b26d6ddeaf9ded135c89bfe5293.png

http://www.chengjinxi.cn/en/Data/upload/20250329/1de6d8890bb1c7d4da1aa05988709cc2.pnghttp://www.chengjinxi.cn/en/Data/upload/20250329/2918766172a39c5a3648309fc2271d2b.png

3. Conclusion

(1) The belt and the roller run smoothly during the transportation, the operating current of the frequency inverter remains stable at around 240A.

(2) The frequency inverter is not be interfered during the switching process while cooperating with the operation bypass function of the system’s power frequency.

(3) The frequency inverter can be started when the belt is fully loaded and the current is around 360A at startup moment.

(4) The interface between the frequency inverter and the controller, as well as the communication and monitoring act normally without any interference or disconnection phenomena.

(5) During the startup and stop processes, the belt moves smoothly without any slipping or roller vibration.

主站蜘蛛池模板: 国精产品一码一码三MBA | 亚洲色婷婷综合久久 | 亚洲AV无码成人精品区蜜桃 | 一区二区动漫 | 俄罗斯极品xxxx | 粉嫩一区二区三区四区公司1 | 黄色wwwwwww | av免播放| 可以在线看的毛片网站 | 国产高清一区二区三区综合四季 | 欧洲mv日韩mv国产mv | 欧美性妇bbb洗澡 | 午夜影院在线 | 黑人中文字幕 | 日韩高清在线观看一区二区 | 国产国产成年年人免 | 国产精品人妻熟女毛片av久久 | 人妻出轨中文字幕不卡一区 | 特级生活片| 少妇大叫太大太爽受不了在线观看 | 亚洲色图欧美一区 | 国产精品VIDEOSSEX国产高清 | 免费观看日韩一级片 | 中文字幕第31页 | 天天躁日日躁AAAAXXXX | 国产精品女A片爽爽免费按摩 | 少妇潮喷无码白浆水视频 | 久久国产精品精品国产 | 观看av在线 | 成人亚洲性情网站www在线观看国产 | 日韩色妇久久av | 亚洲色大成网站WWW永久麻豆 | 精品久久久久久久久久久AⅤ | 国产精品视频★ | 亚洲GV天堂无码男同在线观看 | 久久免费国产精品 | av网站在线播放 | 国产在线看片无码人精品 | 久久国内精品一区二区三区 | 精品国产乱码久久久久久影片 | 国产精品国产三级国产AV剧情 |